2024 Capital Project

The 2024 Capital Project focuses on beautification and infrastructure upgrades of six district buildings: Donlin Drive Elementary, Long Branch Elementary, Elmcrest Elementary, Willow Field Elementary, the Soule Road Complex and the Morgan Road Complex. This work will allow the district to continue to make the programmatic and infrastructure improvements necessary to serve the Liverpool community into the future.

To that end, the 91论坛 CSD has scheduled its 2024 Capital Project Vote for Thursday, March 14. Voting will take place from 6 a.m. to 9 p.m. in the Wetzel Road Elementary gymnasium.

Read the Capital Project issue of the School Bell online now!

Voter Registration and Absentee & Early Ballot Information

Download this form to request an Absentee Ballot

Download this form to request an Early Ballot

Timeline

  • January 22, 2024: Board Resolution/SEQRA Approval
  • February 23, 2024: School Bell Mailed to Community
  • March 6, 2024: Public Hearing at District Office beginning at 6 p.m.
  • March 14, 2024: Capital Project Vote at Wetzel Road Building from 6 a.m. to 9 p.m.

Scope of the Proposed Project

  • Cost: $50,343,941
  • Financed by:
    • Capital Reserve Funds (2021 and 2022)
    • State Education Department Building Aid
    • No Additional Cost to Taxpayers

The proposed capital project will impact six district facilities:

Donlin Drive Elementary

Selective Renovations/Upgrades 

  • Cafeteria Enhancements (Lighting, Paint, Ceilings, Drinking Fountains, and Audiovisual)
  • Gymnasium Renovations (Basketball Backstop Replacement, Paint, Wall Pads, Drinking Fountain)
  • Portable Wheelchair Lift Installation

Replacement/Upgrades 

  • Partitions Wall Infills (10 Locations) 
  • Boiler 
  • Select Office Ventilation System 
  • Select Plumbing 
  • Kitchen Exterior Grease Trap

Site Improvements

  • Sidewalk 
  • Playground Expansion
  • Pavement Repairs
  • Site Drainage
     

Elmcrest Elementary

Selective Renovations/Upgrades 

  • Classroom (23 Classrooms – Floors, Casework, Paint, Sinks/Bottle Fillers, and Wall Infills)
  • Art Room (Flooring, Casework, Lighting, and Other Enhancements)
  • Cafeteria (Flooring, Ceilings, Lighting, Drinking Fountains, and Audiovisual)
  • Gymnasium (Paint Walls, Paint Ceiling, New Wall Pads, and New Back Stops)

Replacement/Upgrades 

  • Library Suite HVAC Systems Replacement
  • Toilet Rooms – ADA Upgrades
  • HVAC System Upgrades
  • Electrical Upgrades
  • Exit Signs Replacements

Site Improvements

  • Site Lighting Replacements/Expansion
  • Paving Improvements (Parking Lots/Pathways, Drives, Improved Circulation, and 30+ Additional Parking Spaces)
  • Sidewalk Replacements
  • Playground Enhancements (Expand and Add K-2 Playground Equipment)

Willow Field Elementary

Selective Renovations/Upgrades

  • Classroom (28 Classrooms – Ceilings, Floors, Casework, Lighting, HVAC, Sinks/Bottle Fillers, and Wall Infills)
  • Library Upgrades (Carpet, Lighting, and Paint)
  • Cafeteria & Stage (HVAC, Flooring, Ceiling, Lighting, Paint, and Audiovisual)
  • Toilet Rooms – ADA Upgrades

Replacement/Upgrades

  • HVAC Upgrades
  • Plumbing Upgrades
  • Gymnasium Lighting
  • Ceilings (Building Wide)

Site Improvements

  • Sidewalk Replacements
  • Selective Paving 
  • Playground Enhancements (Expand and Add K-2 Playground Equipment)
  • Additional Site Lighting
  • New Exterior Site Signage
  • Athletic Fields Site Accessibility Improvements
  • Site Drainage Improvements
     

Morgan Road Complex

Selective Renovations/Upgrades 

  • Elementary School and Middle School Cafetorium Major Renovations (Asbestos Flooring Removal, Ceilings, Lighting, Stage, ADA Accessibility, and Audiovisual)
  • Science Room Renovations
  • Music Program Spaces Improvements
  • Elementary School Gymnasium Renovations (Paint, Wall Pads, Basketball Backstops, Acoustic Panels)
  • Middle School Gymnasium Renovations (Paint, Wall Pads, Basketball Backstops, Acoustic Panels)

Replacement/Upgrades 

  • Middle School Corridor Ceilings and Lights 
  • Partition Wall Infills (9 Locations)
  • Select Ventilation System Upgrades
  • Sewer Ejector Pumps 
     

Long Branch Elementary

Selective Renovations/Upgrades

  • Gymnasium (Paint, Wall Pads, New Basketball Backstop, and Drinking Fountains)
  • Cafeteria Enhancements (Lighting, Paint, Ceilings, Drinking Fountains, and Audiovisual)

Replacement/Upgrades 

  • Classroom Carpet 
  • Library Carpet 
  • Boiler 
  • Select Ventilation Improvements
  • Select Plumbing 
  • Kitchen Exterior Grease Trap
     

Soule Road Complex

Selective Renovations/Upgrades

  • Ceiling Replacements
  • Carpet Replacements
  • Corridor Door Replacements
  • Ventilation Upgrades
  • Kitchen Upgrades including HVAC Systems and Audiovisual
  • Toilet Room 

Replacement/Upgrades

  • Boiler 
  • Chiller Plant 
  • Air Handling Units 
  • Emergency Exit Lighting 
  • Electrical Panels 
  • Domestic Hot Water Storage Tank
  • Plumbing Upgrade

Site Improvements

  • Drainage 
     

Project Schematics